Civil engineering resources and reference tools

Resources

Reference tools and guides for UK construction workers. Bookmark these, print them, share them with your team.

Open Duct run quantity planner

Duct run quantity planner

Count duct metres and whole straight stock lengths by named route section, parallel run and declared allowance, with separate fittings and a procurement export.

Open Pipe bedding and trench calculator

Pipe bedding and trench calculator

Calculate excavation, granular bedding and surround, backfill, aggregate tonnage and bulk bags for a drainage pipe run, with pipe volume deducted.

Open SuDS compliance guide for UK construction

SuDS compliance guide for UK construction

Four-nation SuDS overview with the English runoff hierarchy, interception and water-quality evidence, plus practical maintenance and handover prompts.

Open Surface water interception calculator

Surface water interception calculator

Convert measured contributing areas and rainfall depths into litres and cubic metres, then compare an allocated interception provision with a chosen event volume basis.

Open Watercourse consent brief builder

Watercourse consent brief builder

Prepare an enquiry pack for proposed watercourse works, with separate records for classification, physical activities, discharge, land access, ecology and authority answers.

Open Temporary works compliance checklist

Temporary works compliance checklist

A project record for temporary works roles, inspection evidence, design references and project authorisation or hold references, with legal duties separated from BS 5975 procedures.

Open Civils drawing register builder

Civils drawing register builder

Track drawing numbers, revisions, project-defined status, issue purpose, recipients, superseded references and open actions in a printable working index.

Open Construction RFI log builder

Construction RFI log builder

Track technical queries against drawings, project-system responses, review owners and unresolved actions in a printable working log.

Open Construction variation record builder

Construction variation record builder

Keep a change chronology, evidence index, instruction trail, cost and time assessment notes, and open actions in one printable working record.

Open Kerb quantity estimator

Kerb quantity estimator

Estimate straight kerb units from measured runs, openings, the specified product length and an allowance entered by the user.

Open Earthworks cut & fill calculator

Earthworks cut & fill calculator

Interactive cut and fill volume calculator, soil bulking and compaction factors, disposal tonnage estimator, and CBR reference table for UK groundworkers.

Open Groundworks inspection and test plan builder

Groundworks inspection and test plan builder

Build an editable groundworks ITP with activity stages, hold and witness points, responsibilities, acceptance criteria and evidence records.

Open Drainage test record builder

Drainage test record builder

Create a printable record linking one drainage test to its asset, actual readings, project criteria, evidence, reviewer decision and retest.

Open Concrete specification quick reference for site

Concrete specification quick reference for site

Application selector, exposure classes, cover depths, reinforcement weights, and slump guidance. Everything from BS 8500 that a site agent needs on one page.

Open Temporary dewatering readiness checklist

Temporary dewatering readiness checklist

Record evidence and unresolved actions against England RPS 261 conditions before temporary excavation dewatering. Not a permit or approval.

Open Site delivery slot planner

Site delivery slot planner

Create a same-day delivery timetable, flag overlapping bay or shared-access bookings, then print or export the current working schedule.

Open Manhole schedule checker

Manhole schedule checker

Check a connected manhole schedule for duplicate references, missing links, impossible depths, level runs, backfalls and calculated gradients.

Open Drainage invert level calculator

Drainage invert level calculator

Calculate drainage falls, downstream invert levels and chainage schedules, or check the actual gradient between two surveyed invert levels.

Open Construction noise screening calculator

Construction noise screening calculator

Estimate combined construction activity noise at a receptor from evidenced source levels, distance, on-time and project-specific acoustic corrections.

Open Reinforcement mesh take-off calculator

Reinforcement mesh take-off calculator

Estimate BS 4483 reinforcement mesh sheets, net coverage and delivery weight from slab dimensions, layers and the laps specified on structural drawings.

Open Construction payment date calculator

Construction payment date calculator

Calculate due dates, payment notice deadlines, pay less notice deadlines and final payment dates under the Scheme and editable JCT or NEC4 examples.

Open Underground services safe digging

Underground services safe digging

Interactive checklist for buried services, utility plans, cable avoidance scans, permit-to-dig controls, trial holes, and emergency response.

Open Highway agreements guide: Section 278, 38, 50 and 106

Highway agreements guide: Section 278, 38, 50 and 106

Work out which highway consent your scheme needs, then follow the fees, bond, technical approval and adoption sequence with worked figures from published authority schedules.

Open Dayworks rate calculator for construction variations

Dayworks rate calculator for construction variations

Price a daywork claim from labour, materials, and plant prime cost, apply your contract percentage additions, and see how JCT, CECA, and NEC value the work.

Open Daily noise exposure calculator (LEP,d)

Daily noise exposure calculator (LEP,d)

Add noisy tasks from a shift to calculate daily unprotected noise exposure LEP,d and HSE exposure points, then compare the result with the lower and upper action values.

Open Highway trench reinstatement reference (SROH)

Highway trench reinstatement reference (SROH)

SROH road categories by traffic, excavation types, reinstatement layers, compaction, and the two and three year guarantee periods for UK street works.

Open Hand-arm vibration (HAVS) exposure calculator

Hand-arm vibration (HAVS) exposure calculator

Add the power tools used in a shift to get the daily hand-arm vibration exposure in m/s² A(8) and HSE exposure points, with a traffic-light check against the EAV and ELV and the time each tool is safe to use.

Open Data centre site readiness checker

Data centre site readiness checker

Interactive pre-design checker for UK data centre and AI infrastructure sites, covering power, water, planning, access, groundworks, drainage, and resilience evidence.

Open Aggregate & MOT Type 1 tonnage calculator

Aggregate & MOT Type 1 tonnage calculator

Work out the tonnage of MOT Type 1, sub-base, capping, sand, gravel, or topsoil by area and depth, with typical UK bulk densities, bulk-bag, and tipper-load counts.

Open CITB levy & grants guide for groundworks contractors

CITB levy & grants guide for groundworks contractors

Interactive decision flow for registration, levy calculation, and grant claims under the January 2026 restructure. Worked examples for small firms.

Open CSCS cards for groundworkers

CSCS cards for groundworkers

Visual pathway guide from no card to Gold Supervisor. Costs, timelines, NVQ routes, plant cards, and the June 2026 EUSR changes explained.

Open Percolation test & soakaway sizing calculator

Percolation test & soakaway sizing calculator

Calculate Vp from percolation test results, size a soakaway from drained area, and check septic drainage field suitability per BRE Digest 365 and Approved Document H2.

Open Rebar bending schedule calculator (BS 8666:2020)

Rebar bending schedule calculator (BS 8666:2020)

Cutting lengths, bar weights, mandrel diameters, and lap lengths for UK steel fixers and RC subbies. Built around BS 8666:2020 shape codes with Eurocode 2 lap reference.

Open UK drainage gradients & falls quick reference

UK drainage gradients & falls quick reference

Interactive calculator and reference tables for pipe gradients, bedding classes, and access point spacing. Everything from Approved Document H in one place.

Open CDM 2015 dutyholder identifier

CDM 2015 dutyholder identifier

Interactive decision pathway for UK construction projects. Identify your CDM role, principal dutyholder appointments, F10 notification position, and pre-start document checks.

Open Working at height equipment selector

Working at height equipment selector

Interactive selector for ladders, towers, MEWPs, scaffolds, roof edge protection, fragile surfaces, rescue planning, and inspection checks.

Open Concrete volume calculator & mix selector

Concrete volume calculator & mix selector

Work out concrete volume by shape, get an indicative BS 8500 strength class, a wastage allowance, and a ready-mix truck count for a UK pour.

Open EV charging infrastructure civil works guide

EV charging infrastructure civil works guide

Interactive reference tool for UK EV charging installations. Cable specs, substation thresholds, groundworks scope, DNO connection timelines, and regulatory checklists by charger power tier.

Open CIS & self-employment tax guide for UK construction workers

CIS & self-employment tax guide for UK construction workers

Interactive take-home pay calculator, CIS deduction rates explained, and a self-employed vs limited company decision flow with real construction day rates.

Open PPE compliance quick reference for UK groundworks

PPE compliance quick reference for UK groundworks

EN standard decoder, task-based PPE selector, hard hat replacement lookup, and the April 2022 employer-pays rule. What to spec and what to refuse when the PPE rep calls.

Open Site safety induction checklist & toolbox talk quick reference

Site safety induction checklist & toolbox talk quick reference

Interactive CDM 2015 induction checklist, 20 toolbox talk topics, RIDDOR quick reference, and seasonal safety considerations.

Open Foundation depth near trees calculator

Foundation depth near trees calculator

Interactive foundation depth estimator for shrinkable clay near trees. D/M ratio, tree water demand, soil shrinkability, and risk zone per NHBC Standards 4.2 and BRE Digest 240.

These resources are free to use, share, and print. Built by construction professionals for construction professionals.