Electricity connection civil works
Cable trenching, ducting, joint bays, substation bases and reinstatement for Independent Connection Providers (ICPs), main contractors and developers across the UK.
- LV and HV cable trenching
- Duct installation, draw pits and joint bays
- Substation bases and reinforced plinths
- Backfilling and surface reinstatement
- Highway access and traffic management coordination
- Connection delivery with UK Power Connections
Generated by your browser's built-in AI. May not be fully accurate.
Civils for new electricity connections
Rospower Projects delivers the civil works that prepare a site for a new electricity connection: cable routes, ducts, joint bays, substation bases and reinstatement. We work with Independent Connection Providers (ICPs), main contractors and developers on residential and commercial developments across the UK.
Send us your site location and connection drawings so we can define and price the civils package, including access, excavation, backfilling and the surfaces to be reinstated.
Latest cable civils appointment
For our latest appointment, read about the 33 kV cable civils scheme in Scotland: 4 km of route across agricultural land and carriageway, covering route preparation, duct installation and permanent reinstatement. This new contract is separate from the completed LV projects below.
Completed electricity connection projects
Our published LV network projects with UK Power Connections show the works on site, from protected cable routes through to completed reinstatement.
Anstey Lane, Alton
For the Meadow Vale residential development, Rospower Projects delivered a network installation with approximately 380 metres of waveform cable and 14 residential connections. The package included excavation, traffic management under two-way portable signals, and reinstatement along the live highway.
View the Alton LV network project and site photographs.
Aycliffe Road, Borehamwood
The Aycliffe Road installation included approximately 75 metres of waveform cable, nine residential connections and a three-phase supply for a community centre. The works required a road closure, a signed diversion and coordination around a neighbouring school and surgery, followed by footway and carriageway reinstatement.
View the Borehamwood LV network project and site photographs.
What the civil works package can include
Cable trenching and duct installation
- Excavation for LV and HV cable routes, with service crossings and access requirements identified in the agreed scope
- Duct installation, draw pits and joint bays to the connection design
- Backfilling, compaction and reinstatement of the affected surfaces
Substation bases and external works
- Reinforced concrete substation bases, transformer plinths and switchroom foundations
- Access hardstanding, drainage and fencing around the compound
- Interfaces with the wider warehouse groundworks or data centre civils package
Highway works and site access
Where the cable route crosses a highway or footway, the package needs to account for traffic management, pedestrian access, permits and reinstatement. Our Alton and Borehamwood cases show this work in live highway settings. We establish the required approvals and who is responsible for obtaining them when agreeing the scope.
Working with your ICP
For accredited electricity connection delivery, Rospower Projects works in partnership with UK Power Connections Ltd. NERS accreditation for this delivery route is held through UK Power Connections. The applicable accredited scopes and responsibilities are confirmed for each package.
The civils scope should sit alongside named responsibilities for connection design, electrical installation, jointing, testing, adoption and energisation. We agree these interfaces with your project team and connection provider so that the enquiry and quotation describe the work required.
Request a quote for connection civils
For an initial review, send the information you have available:
- Site address and postcode
- Connection layout, point of connection and proposed cable route
- Trench, duct, joint bay and substation base details
- Existing surfaces, known services and access restrictions
- Required programme and the ICP or network operator involved
- The proposed split between civils, electrical works and approvals
We price against the agreed scope, drawings, site conditions and access requirements. Request a civils quote or contact Rospower Projects to discuss the package.