Groundworks and civils, delivered for main contractors and developers
We deliver groundworks, drainage, external works and utility connections as a single package, for warehouse, logistics, food and utility projects across the South East and beyond. Pre-qualified, self-delivered, and built to programme.
A groundworks partner you can pre-qualify with confidence
Rospower Projects delivers the groundworks and civils package on industrial, logistics, food and utility schemes. We bring our own teams, plant and accreditations, so the work you award stays on programme and clears pre-qualification without delay.
Who we work with
Main contractors
We take the groundworks and external works package off your critical path, with the accreditations and paperwork your pre-qualification needs.
Developers and investors
From single warehouse units to multi-plot schemes, we turn a cleared site into a foundation-ready platform.
Food and manufacturing
Floor slabs, drainage and external works built to the standards production sites are audited against.
Estate and facilities managers
Planned and reactive civils across your portfolio: car parks, drainage, access roads and hardstanding.
Why teams award us the package
One package, fewer interfaces
Groundworks, drainage, external works and NERS utility connections under one subcontract, so you are not coordinating four trades and carrying the gaps between them.
Pre-qualification ready
Constructionline Silver, CHAS, and CSCS-carded operatives. Our pre-qual pack goes out the same day you ask for it.
Self-delivered labour and plant
Our own teams and machines, not a chain of sub-subcontractors, so the programme stays in our control.
Fixed scope, programme and price
You get scope, timings and a price up front, with risks flagged early rather than at the variation stage.
Health and safety that holds up to audit
Independently audited health, safety and environmental systems, reviewed annually.
Based near Watford, working wider
Strongest across the South East and Home Counties, with framework delivery into the Midlands and beyond.
Accreditations and pre-qualification
We are set up to clear pre-qualification quickly. On request we can send everything your supply chain team needs.
Insurance cover
Confirmed by certificate. Copies available on request.
Liability
- Public liability
- £5m
- Products liability
- £5m
- Employer's liability
- £10m
- Professional indemnity
- £2m
Contract works (CAR)
- Contract works / CAR
- £1m
- Maximum contract value
- £250k
- Maximum contract length
- 4 months
Plant and equipment
- Own plant
- £35k
- Hired-in plant
- £25k
- Single article, any one location
- £100k
These are our standard certificate limits. Where a project calls for more, raising them is not a problem: we routinely arrange increased contract works, single-contract value and plant cover with our insurer to suit the scope before we mobilise. Send us the requirement and we will confirm the limits in writing.
What we can send for pre-qualification
- Insurance certificates and company registration details
- Health and safety policy, sample RAMS and method statements
- Environmental and quality management policies
- CSCS records for site operatives and supervisors
- Project references on request
The work we take on
We take on groundworks and civils packages across new-build and refurbishment work. Typical scopes include:
- Bulk earthworks, cut and fill, and site clearance
- Foundations, slabs and hardstanding
- Drainage, SuDS and external works
- Estate roads, car parks and access
- LV and HV utility connections and substation civils
Sectors: warehouse and logistics, self-storage and retail, food and manufacturing, renewable energy, data centre civils, and public sector infrastructure.
How we engage
Enquiry
Send us drawings or a short brief and we confirm whether the package is a fit.
Site review and scope
We review levels, drainage, access and ground conditions, then confirm the scope of works.
Fixed proposal
You receive scope, programme and price in one place, with risks flagged.
Mobilise
Teams and plant on site to programme, with a single point of contact throughout.
Recent work
Copart - New Operations Centre, Dunfermline
Copart/Rose Consulting · Dunfermline, Scotland
Copart - Site Development, Wisbech
Copart/Rose Consulting · Wisbech, Cambridgeshire
LV network installation, Anstey Lane, Alton
UK Power Connections · Alton, Hampshire
Section 278 works at Cory's Barking Transfer Station
Integrated Solutions Contracting · Barking, East London
Add Rospower to your next project
Download the capability statement, or send us a brief and we will come back with scope, programme and price.