# Site delivery slot planner

> Create a same-day delivery timetable, flag overlapping bay or shared-access bookings, then print or export the current working schedule.

- Canonical HTML: https://rospower.co.uk/resources/site-delivery-slot-planner/
- Documentation index: https://rospower.co.uk/llms.txt
- Updated: 2026-09-21

> This Markdown version contains the published explanatory content. Use the canonical HTML page for calculators, builders and other interactive controls.

## Page content

Build a same-day working timetable for deliveries, unloading bays and any access route that the site team declares as shared.

**A delivery slot** is a planned period for one vehicle or load. The planner protects the unloading duration plus the buffer you enter. It flags only bookings on the same date that share a named bay or an explicitly entered shared access route.

This is a coordination aid, not a traffic-management plan, route approval, lifting plan or confirmation that a vehicle or unloading arrangement is safe. Agree the site arrangements with the relevant parties before delivery.

## Plan delivery slots

No names, phone numbers or server upload are needed. This working copy stays in this browser until you leave the page.

Current bookings

0

Conflicting bookings

0

Input issues

0

Add a delivery to begin the current working schedule. A booking can run up to midnight, but cannot cross into the following date.

### Ordered schedule

Valid bookings are ordered by date and start time. A protected interval includes the unloading duration and any entered buffer.

Valid bookings will appear here as you complete them.

This planner works in this browser only. Nothing is uploaded or stored.

## How conflicts are checked

Two protected intervals conflict only when they genuinely overlap. If one ends at 10:30 and another starts at 10:30, they touch but do not overlap.

## Bay and access are separate

Different bays may overlap. Enter the same shared access route, such as a gate or one-way route, on both rows only when those movements should be coordinated together.

## Use a project decision for timings

The duration and buffer are working assumptions entered by your team. The tool does not predict travel time, unloading time or site capacity.

## Coordinate the delivery plan

HSE says suppliers, carriers and recipients should exchange delivery safety information and agree a safe delivery plan. Its examples include site restrictions, approach routes, unloading areas, who is in charge and what to do when an arrangement is not satisfactory.

Use this timetable as one record in that conversation. Confirm the project-specific controls and responsibilities separately. A clear calendar entry does not by itself resolve access, unloading, lifting or traffic-management risks.

[HSE: Delivering safely](https://www.hse.gov.uk/workplacetransport/information/cooperation.htm)

Related guidance

- [Site safety inductions](https://rospower.co.uk/resources/site-safety-inductions/)
- [Groundworks ITP builder](https://rospower.co.uk/resources/groundworks-itp-builder/)
- [Data centre site readiness checker](https://rospower.co.uk/resources/data-centre-site-readiness/)
- [Project planning and management](https://rospower.co.uk/planning-project-management/)