# Drainage test record builder

> Create a printable drainage test record with asset references, actual readings, project criteria, evidence, reviewer decisions and retest links.

- Canonical HTML: https://rospower.co.uk/resources/drainage-test-record-builder/
- Documentation index: https://rospower.co.uk/llms.txt
- Updated: 2026-10-06

> This Markdown version contains the published explanatory content. Use the canonical HTML page for calculators, builders and other interactive controls.

## Page content

Record what was tested, the actual observations and the evidence behind a reviewer decision. No default test values or automatic acceptance.

## A record, not a test method or certificate

Evidence record only. Not a testing method, safe system of work, certificate, acceptance decision or authority to enter a chamber. No automatic pass or fail is calculated. The competent test team must establish the method, equipment, safe working arrangements and applicable criteria before testing. This page gives no pressure, duration, leakage allowance or other numerical threshold.

## Build the working record

Entries stay in this page's memory. They are not stored or uploaded by this tool and are lost when you leave or reload. Download a text copy, print or save as PDF before leaving. Saved copies cannot be imported back into this form. Use role and document references instead of unnecessary personal information.

Key details are prompts, not a certification checklist. Blank, unknown, pending and not applicable mean different things: state the appropriate position explicitly. Long text fields allow 10,000 characters; short fields allow 2,000.

The record has not been checked. No approval is inferred.

Preview the current print record

## Use one record for one defined test event

An inspection and test plan states what the project intends to check. This worksheet records an individual event: the asset, the method used, what was observed and the evidence supporting the review. It can also document a test that was not started or was aborted. Do not mark a test completed merely because the form contains text.

Identify the tested limits using controlled drawing references and revisions. A result for one section does not establish the condition of an untested branch, connection or adjoining run. State exclusions and deviations so the reviewer can understand the limits of the record.

## Keep criteria, readings and decisions separate

Criteria are the project requirements against which results are reviewed. Readings are the actual measured values or observations, with their units and timing. The reviewer decision is a separate entry linked to the person or role with the appropriate authority. The builder performs no technical comparison between those entries.

Add a reading for each relevant parameter or observation. Reference the original instrument output, report or photograph in the evidence index. Entering a file location does not attach the file: retain the originals in the controlled project record system.

## Preserve the first result when retesting

If corrective work or a repeat test is needed, keep the original event and its decision. Start a separate record for the retest, linking the previous reference and any non-conformance record. A non-conformance record documents a departure from specified requirements and the actions taken to address it. Do not overwrite an earlier failed or incomplete result with a later one.

Download a text copy, print the current record or use the browser's Save as PDF option. Review the output before filing it, especially the asset limits, units, unentered fields and unresolved actions. The document remains an unsigned working record, not an authenticated certificate.

## Sources and limits

- [Water UK Sewerage Sector Guidance, Appendix C, approved version 2.3 (11 November 2023)](https://www.water.org.uk/sites/default/files/2023-11/SSG%20Appendix%20C%20-%20Design%20and%20Construction%20Guidance%20v2-3_0.pdf) concerns foul and surface water sewers offered for adoption under the Code for adoption agreements for water and sewerage companies operating wholly or mainly in England. Its testing requirements are not universal rules for every private drain. Confirm the applicable documents, revisions and undertaker requirements for the actual project.
- [HSE introduction to confined spaces](https://www.hse.gov.uk/confinedspace/introduction.htm) explains avoiding entry where possible and the need for assessed controls and emergency arrangements where entry is necessary. This record does not authorise chamber entry or establish that it is safe.

Source scope checked 6 October 2026. This original administrative worksheet does not reproduce a Water UK test form or certify compliance with a standard.

Related guidance

- [Groundworks ITP builder](https://rospower.co.uk/resources/groundworks-itp-builder/)
- [Drainage CCTV survey brief](https://rospower.co.uk/blog/drainage-cctv-survey-brief/)
- [Groundworks handover pack](https://rospower.co.uk/blog/groundworks-handover-pack/)
- [Work with Rospower Projects](https://rospower.co.uk/work-with-us/)