# CIS & self-employment tax guide

> Interactive CIS take-home pay calculator, deduction rates explained, and self-employed vs limited company decision flow. Built for UK construction workers.

- Canonical HTML: https://rospower.co.uk/resources/cis-tax-construction/
- Documentation index: https://rospower.co.uk/llms.txt
- Updated: 2026-05-14

> This Markdown version contains the published explanatory content. Use the canonical HTML page for calculators, builders and other interactive controls.

## Page content

What actually lands in your bank account. CIS deductions, tax, NI, and the real take-home number for UK construction workers.

## CIS take-home calculator

Enter your day rate and working pattern. This calculates the real take-home after CIS deductions, income tax, National Insurance, and typical expenses.

£

£

Typical range: £80-200/week. Includes fuel, tools, PPE, phone, van costs, insurance.

Annual Gross

£46,000

230 days worked

CIS Deducted at Source

£9,200

20% of gross

Tax + NI Owed

£7,311

After expenses deducted

Real Take-Home

£33,169

£144/day effective

Show full breakdown

## CIS deduction rates explained

The Construction Industry Scheme requires contractors to deduct tax at source from subcontractor payments. Your deduction rate depends on your registration status.

20%### Verified (Standard)

Most CIS workers

- • Registered with HMRC, UTR number confirmed
- • 20% deducted from labour element of invoices
- • Deductions count as advance tax payments
- • Overpayments reclaimed via Self Assessment

30%### Unverified

No UTR or failed verification

- • Not registered, or UTR not verified by HMRC
- • 30% deducted (50% more than standard)
- • Fix this: register as self-employed, get your UTR
- • After registering, your UTR usually arrives from HMRC within about 15 days

0%### Gross payment status

Higher earners, good compliance

- • No deductions at source, paid gross
- • Requires passing HMRC turnover, business, and compliance tests
- • Must pass HMRC compliance test (tax returns filed on time, no outstanding tax debts)
- • Better cash flow, but you must budget for tax

## Self-employed vs limited company vs umbrella

Answer these questions to find out which structure makes sense for your situation.

What is your annual gross income from construction work?

Day rate x days worked per year. Be realistic about days: most workers do 200-240 days, not 260.

Do you have significant allowable expenses (over £5,000/year)?

Vehicle costs, tools, equipment, subcontractors you hire, materials you supply. Not personal expenses.

Are you working for a single client, or multiple clients?

This affects IR35 risk. Working exclusively for one client makes it more likely HMRC considers you an employee, not a contractor.

CIS self-employed (sole trader) is almost certainly your best option.

At under £45,000 annual income, the tax savings from a limited company are minimal or negative after you factor in doubled accountant costs (£2,000-2,400/year vs £1,000-1,200), Companies House fees, and the administration of running a company.

The tax gap has narrowed since the old flat 19% Corporation Tax regime. Small companies now face a mix of the 19% small profits rate, marginal relief, or the 25% main rate depending on profit, so the limited-company win at this level is often much smaller than people expect.

**Key action:** make sure you're registered and verified (20% CIS rate), claim all allowable expenses, and file your Self Assessment on time to reclaim any CIS overpayments.

CIS self-employed is probably still best. The limited company advantage is marginal at best.

In the £45,000-60,000 range with low expenses, a limited company might save you £500-1,500 per year after accountant costs. That's not nothing, but it comes with significant extra administration: annual accounts, corporation tax returns, dividend paperwork, and Companies House filings.

Talk to a construction-specialist accountant who can run the numbers for your specific situation. The breakeven depends on your exact expenses, whether you have a partner who can be a shareholder, and how much you value simplicity.

**If you go limited:** use a construction-specialist accountant (not a general high-street firm), and budget £200/month for accounting fees rather than the £100/month you'd pay as a sole trader.

A limited company may be worth exploring, but get specific advice first.

With £45,000-60,000 income and significant expenses, a limited company can sometimes offer tax efficiencies, but the outcome depends on profit level, dividend tax, accountant fees, and whether small-profits rate or marginal relief applies.

**But check IR35 first.** If you're working for one or two clients through an agency, you may be caught by IR35 rules, which means you'd be taxed as an employee regardless of your company structure. In that case, an umbrella company or staying CIS self-employed is more honest and less risky.

Get a construction-specialist accountant to model your specific numbers before committing.

A limited company is likely your best option at this income level.

Over £60,000 with multiple clients, a limited company is more likely to be worth modelling properly, but the saving is not automatic. It depends on actual company profit, dividend tax bands, accountant costs, and whether you can stay outside IR35.

**Typical structure:** a low salary plus dividends from post-tax company profit, with the exact split set by your accountant for the current tax year.

**Budget for:** accountant fees of £200-250/month, Companies House annual filing, professional indemnity insurance, and the administrative time of running a company.

Be careful. Working mainly for one client creates IR35 risk.

IR35 rules exist to prevent "disguised employment": working full-time for one company but through a limited company to reduce tax. Since April 2021, medium and large contractors are responsible for determining your IR35 status. If they determine you're "inside IR35," you'll be taxed as an employee regardless of your company structure.

At over £60,000 with one main client, a limited company could still save you money, but only if your working arrangements genuinely look like contracting (you control how and when you work, you can send a substitute, you bear financial risk). If the client tells you when to show up, where to work, and how to do the job, you're probably inside IR35.

**Get specialist advice.** An IR35 determination from a specialist (not just your accountant) costs £300-500 and could save you thousands in penalties. If you're inside IR35, staying CIS self-employed is the honest and cheaper option.

## Tax year calendar for CIS workers

Key dates every self-employed construction worker needs to know. Missing these costs you money in penalties and interest.

| Date | What | Why It Matters |
| --- | --- | --- |
| 6 April | New tax year starts | Your CIS deduction statements for the previous year should arrive around now |
| 5 October | Register for Self Assessment (if new) | Must register by this date if this is your first year of self-employment |
| 31 October | Paper tax return deadline | Only if filing on paper (most people file online) |
| 31 January | Online tax return + payment deadline | £100 penalty if even 1 day late. Plus interest on unpaid tax. This is the big one |
| 31 January | First payment on account due | 50% of next year's estimated tax bill. Catches many workers off guard in year 2 |
| 31 July | Second payment on account due | Another 50% advance payment. Budget for this or you'll face penalties |
**Payments on account:** after your first year, HMRC requires you to pay tax in advance based on last year's bill. This means in January you pay your final bill for the previous year PLUS 50% of next year's estimated bill. Many workers are caught out by this double payment in their second year.

## Common mistakes that cost you money

These are the things that construction workers consistently get wrong, based on what we see across our subcontractor base.

### Not claiming mileage

You can claim 45p per mile for the first 10,000 business miles, then 25p per mile after that. If you drive 30 miles each way to site, that's 60 miles per day, 300 miles per week, roughly 14,000 miles per year. That's £5,500 in tax-deductible mileage (10,000 x 45p + 4,000 x 25p). At 20% tax, that's £1,100 saved. Many workers either don't claim at all or don't keep a mileage log (which means HMRC can reject the claim).

### Not claiming tools and PPE

Every tool you buy for work is an allowable expense: hand tools, power tools, PPE (boots, gloves, hard hat, hi-vis, eye protection, ear defenders). Keep receipts. If you spend £1,500/year on tools and PPE and don't claim it, that's £300 in unnecessary tax at the basic rate.

### Not reclaiming CIS overpayments

If your CIS deductions exceed your actual tax liability (common for workers with significant expenses), HMRC owes you money. You can only get this back by filing a Self Assessment tax return. Some workers don't file because they think CIS deductions cover their tax. They might be leaving £1,000-3,000 on the table each year.

### Using a non-specialist accountant

A high-street accountant who mainly handles retail shops and restaurants won't know about construction-specific rules: the temporary workplace rules that determine whether your travel to site is tax-deductible, the CIS reconciliation process, or the flat-rate deduction for tools. A construction-specialist accountant costs roughly the same (£80-150/month) and will typically save you more than the fee in properly claimed expenses.

### Ignoring the "temporary workplace" rule

Your travel to site is tax-deductible only if the site is a "temporary workplace" (you expect to be there for less than 24 months). If you've been on the same site for over 2 years, your travel costs are no longer deductible. Most construction workers move sites regularly and qualify, but if you're on a long-term project, check with your accountant.

## Sources

- [What you must do as a CIS subcontractor](https://www.gov.uk/what-you-must-do-as-a-cis-subcontractor/overview) (GOV.UK)
- [Construction Industry Scheme guide CIS 340](https://www.gov.uk/government/publications/construction-industry-scheme-cis-340/construction-industry-scheme-a-guide-for-contractors-and-subcontractors-cis-340) (GOV.UK)
- [Income Tax rates and thresholds](https://www.gov.uk/income-tax-rates) (GOV.UK, 2026/27 tax year)
- [National Insurance rates and allowances](https://www.gov.uk/government/publications/rates-and-allowances-national-insurance-contributions/rates-and-allowances-national-insurance-contributions) (GOV.UK, 2026/27 tax year)
- [Tax on dividends](https://www.gov.uk/tax-on-dividends) (GOV.UK)
- [Corporation Tax rates](https://www.gov.uk/corporation-tax-rates) (GOV.UK)
- [IR35 (off-payroll working) rules](https://www.gov.uk/guidance/understanding-off-payroll-working-ir35) (GOV.UK)

Built by [Rospower Projects](https://rospower.co.uk/). We manage CIS payments for subcontractors across our projects and pay on time, every time.

[Get in touch](https://rospower.co.uk/contact/)

Related resources

- [What UK construction workers actually take home in 2026](https://rospower.co.uk/blog/construction-pay-2026/)
- [CITB levy & grants guide](https://rospower.co.uk/resources/citb-levy-grants/)
- [CSCS cards for groundworkers](https://rospower.co.uk/resources/cscs-cards-groundworkers/)
- [Our services](https://rospower.co.uk/services/)
