# CDM 2015 dutyholder identifier

> Interactive UK CDM 2015 pathway to identify client, designer, contractor, principal dutyholder, F10 notification, and construction phase plan duties.

- Canonical HTML: https://rospower.co.uk/resources/cdm-dutyholder-identifier/
- Documentation index: https://rospower.co.uk/llms.txt
- Updated: 2026-05-26

> This Markdown version contains the published explanatory content. Use the canonical HTML page for calculators, builders and other interactive controls.

## Page content

Work out which CDM role you hold, who must be appointed, whether the project is F10 notifiable, and which documents should exist before site work starts.

## Before you use the selector

**CDM 2015** means the Construction (Design and Management) Regulations 2015. A **dutyholder** is a person or organisation with legal duties under those regulations, such as a client, designer, contractor, principal designer, or principal contractor.

This page follows the HSE dutyholder structure. It is a planning aid for UK construction projects, not a substitute for reading the regulations, HSE L153, or taking project-specific legal advice.

PD

**Principal designer**, the designer appointed to plan, manage, monitor, and coordinate pre-construction health and safety.

PC

**Principal contractor**, the contractor appointed to plan, manage, monitor, and coordinate the construction phase.

F10

**F10 notification**, the online notice submitted to HSE when a construction project meets the notification thresholds.

## Identify your CDM position

Select the project setup. Matching dutyholder cards and F10 trigger rows are highlighted below.

A domestic client has construction work carried out on their own home and not for a business.

Count subcontractors as contractors. If more than one contractor is involved, CDM principal roles apply.

working days

Person-days means all workers added together across the project. Ten workers for 50 days equals 500 person-days.

Your likely position

### Commercial client with principal appointments

You should appoint a principal designer and principal contractor because more than one contractor is involved.

Immediate checks

## F10 notification trigger

A project is notifiable to HSE if it is expected to last longer than 30 working days and have more than 20 workers working at the same time at any point, or if it is expected to exceed 500 person-days. These thresholds come from [CDM Regulation 6](https://www.legislation.gov.uk/uksi/2015/51/regulation/6/made) and the [HSE CDM FAQ](https://www.hse.gov.uk/construction/cdm/faq/index.htm).

| Trigger | How to read it | Your selector result |
| --- | --- | --- |
| Longer than 30 working days and more than 20 workers at peak | Both parts must be true. Thirty days exactly is not enough unless the person-day trigger also applies. | Checking... |
| More than 500 person-days | Add each worker's working days across the whole construction phase. | Checking... |

## CDM dutyholder cards

The selector highlights the roles most likely to apply to your setup. On real projects, one organisation can hold more than one duty, but each duty still needs to be covered.

CC### Commercial client

A business or organisation having construction work carried out.

- • Make suitable arrangements for managing the project.
- • Allow enough time and resources for health and safety.
- • Provide pre-construction information, meaning existing site and design risk information needed before work starts.
- • Appoint the PD and PC in writing where more than one contractor is involved.
- • Ensure a construction phase plan and welfare arrangements are in place.

DC### Domestic client

A person having work done on their own home, not for a business.

- • Domestic client duties normally transfer to the contractor, or to the PC where there is more than one contractor.
- • The domestic client can agree in writing that the PD carries the client duties instead.
- • The contractor or PC still needs a construction phase plan for the work.

D### Designer

Anyone preparing or modifying designs, including drawings, specifications, and design details.

- • Eliminate, reduce, or control foreseeable design risks.
- • Provide information about significant remaining risks.
- • Cooperate with the PD and other designers.
- • Do not start design work unless satisfied that the client understands their CDM duties.

PD### Principal designer

Required when more than one contractor is involved.

- • Plan, manage, monitor, and coordinate health and safety in the pre-construction phase.
- • Help the client gather pre-construction information.
- • Coordinate designers and pass relevant information to the PC.
- • Prepare the health and safety file, meaning the record of information needed for future maintenance, cleaning, alteration, or demolition.

PC### Principal contractor

Required when more than one contractor is involved.

- • Plan, manage, monitor, and coordinate the construction phase.
- • Prepare and keep the construction phase plan, meaning the live plan for site risks, rules, welfare, and management arrangements.
- • Organise site induction, cooperation, consultation, and worker engagement.
- • Make sure welfare facilities are provided from the start and remain suitable.

C### Contractor

Anyone carrying out, managing, or controlling construction work.

- • Plan, manage, and monitor the work under their control.
- • Check workers have the right skills, knowledge, training, and experience.
- • Cooperate with the PC and follow the construction phase plan.
- • If there is only one contractor, prepare the construction phase plan.

W### Worker and supervisor

People carrying out construction work, including site supervisors when they also control work activities.

- • Take reasonable care of their own health and safety and that of others affected by their acts.
- • Cooperate with employers, contractors, and the PC.
- • Report anything likely to endanger health or safety.

Supervisors also need to make sure instructions, permits, exclusion zones, and RAMS controls are followed on site. RAMS means risk assessments and method statements.

## Single contractor or multiple contractors?

This is the switch that most often changes the CDM structure. A small job can still need principal roles if more than one contractor is involved.

### One contractor only

- • No PD or PC appointment is required.
- • The contractor must prepare the construction phase plan.
- • The client still needs suitable arrangements and pre-construction information.
- • F10 notification can still apply if the duration or person-day thresholds are exceeded.

### More than one contractor

- • A PD and PC must be appointed.
- • The PC prepares the construction phase plan.
- • The PD coordinates pre-construction health and safety and prepares the health and safety file.
- • Domestic client duties transfer to the contractor, PC, or PD by written agreement.

## Document checklist

0 / 8 checked

Use this as a pre-start prompt. It does not prove compliance by itself, but it helps expose missing appointments or missing information before work starts.

Tick each item as you confirm it.

## Frequently asked questions

### Does a small construction job need a construction phase plan?

Yes. HSE guidance says a construction phase plan is needed for every construction project. On a small job it can be short, but it still needs to cover the work, site rules, welfare, and main risk controls.

### Can the same company be principal designer and principal contractor?

Yes, if it has the right organisational capability and competence for both roles. On design and build projects, the main contractor may hold both duties, but the duties remain separate and both need to be managed.

### Who submits the F10 notification?

The client duty includes notification, but the client can ask another party to submit it for them. On domestic projects, client duties normally transfer, so the contractor, PC, or agreed PD should confirm who is making the notification.

### Does CDM only apply to notifiable projects?

No. CDM duties apply to construction work whether or not the project is notifiable. Notification is a separate trigger based on project duration, peak workforce, and total person-days.

## Sources

- [HSE CDM 2015 dutyholder responsibilities](https://www.hse.gov.uk/construction/cdm/2015/responsibilities.htm) - client, designer, contractor, principal designer, and principal contractor duties
- [HSE summary of CDM 2015](https://www.hse.gov.uk/construction/cdm/2015/summary.htm) - overview of what changed and how the regulations apply
- [HSE commercial client guidance](https://www.hse.gov.uk/construction/cdm/2015/commercial-clients.htm) - client duties for business and organisational projects
- [HSE domestic client guidance](https://www.hse.gov.uk/construction/cdm/2015/domestic-clients.htm) - how domestic client duties transfer
- [HSE CDM FAQ](https://www.hse.gov.uk/construction/cdm/faq/index.htm) - notification threshold wording and common CDM questions
- [HSE F10 notification guidance](https://www.hse.gov.uk/construction/cdm/2015/f10form.htm) - how to notify HSE before construction starts
- [HSE F10 online notification form](https://www.hse.gov.uk/forms/notification/f10.htm) - project notification service
- [HSE L153 managing health and safety in construction](https://www.hse.gov.uk/pubns/books/l153.htm) - legal guidance on CDM 2015
- [HSE CIS80 construction phase plan](https://www.hse.gov.uk/pubns/cis80.pdf) - template plan for small projects
- [The Construction (Design and Management) Regulations 2015](https://www.legislation.gov.uk/uksi/2015/51/contents/made) - legislation text

Related resources

- [Site safety induction checklist](https://rospower.co.uk/resources/site-safety-inductions/)
- [Temporary works compliance checklist](https://rospower.co.uk/resources/temporary-works-checklist/)
- [PPE compliance quick reference](https://rospower.co.uk/resources/ppe-compliance/)
- [CDM 2015 in practice: a contractor's view](https://rospower.co.uk/blog/cdm-review-ciob-2026/)
- [Industrial and commercial construction](https://rospower.co.uk/services/industrial-commercial-construction/)