# Drainage & utility connections in Stevenage

> Rospower delivers civil engineering and groundworks in Stevenage. Life sciences, logistics, and town regeneration specialists. NERS accredited. Call 07983 740 555.

- Canonical HTML: https://rospower.co.uk/areas/stevenage/
- Documentation index: https://rospower.co.uk/llms.txt
- Area type: town
- County: hertfordshire
- Updated: 2026-04-15

## Page content

## Civil engineering in Stevenage, Hertfordshire

Rospower Projects is a national civil engineering contractor delivering groundworks, utility infrastructure, and site-wide construction packages for clients including Copart, Safestore, and Tilda Foodservice. Stevenage combines one of the UK's most significant life sciences clusters, a mature industrial base, and an active town centre regeneration, creating a steady pipeline of civil engineering opportunities aligned with our capability.

### Life sciences and advanced manufacturing

Gunnels Wood Road, anchored by [GSK](https://www.gsk.com/), [Airbus Defence and Space](https://www.airbus.com/en/products-services/defence), and the [Stevenage Bioscience Catalyst](https://stevenagebiosciencecatalyst.com/), is one of Europe's most significant life sciences and advanced manufacturing estates. These facilities demand civil engineering contractors who can deliver precise foundation systems for sensitive equipment, high-capacity utility connections, controlled drainage, and phased programmes within live, secure campuses. Rospower's experience with food-grade and precision industrial facilities for clients including Tilda Foodservice translates directly to this environment.

### Logistics and distribution

The A1(M) corridor around Stevenage supports a significant logistics and distribution sector. Rospower delivers the specialist civil engineering that warehouse and distribution facilities require, including heavy-duty yard construction, loading bay foundations, and drainage designed for large impermeable areas.

### Town centre regeneration

The SG1 town centre regeneration masterplan is reshaping Stevenage with substantial mixed-use, public realm, and commercial investment. These schemes demand comprehensive civil engineering: site preparation, below-ground drainage, foundation packages, and coordinated utility installations. Our NERS accreditation, in partnership with [UK Power Connections Ltd.](https://www.lrqa.com/en-gb/utilities/ners/search/?q=UK+power+connections), allows us to deliver gas, water, electric, and telecommunications connections under a single contract.

### Utility connections and drainage

Stevenage's combination of industrial estate upgrades, town centre intensification, and expanding life sciences capacity generates regular demand for utility diversions, surface water management, and SuDS-compliant drainage design. Our teams routinely deliver these packages for new-build and refurbishment projects alongside wider civil engineering scope.

### Public sector works

[Stevenage Borough Council](https://www.stevenage.gov.uk/) and Hertfordshire County Council commission a range of infrastructure and facility projects across the area. Rospower holds Constructionline Silver accreditation and operates the quality management and health and safety systems that public sector procurement requires.

### Get a quotation

For civil engineering in Stevenage, call Rospower on **07983 740 555** or email **hello@rospower.co.uk**. We will arrange a site visit and provide a detailed quotation.
