# Infrastructure & groundworks in Staines-upon-Thames

> NERS accredited civil engineering contractor delivering logistics, commercial, and data centre projects in Staines-upon-Thames. National track record. Call Rospower on 07983 740 555.

- Canonical HTML: https://rospower.co.uk/areas/staines/
- Documentation index: https://rospower.co.uk/llms.txt
- Area type: town
- County: surrey
- Updated: 2026-04-15

## Page content

## Civil engineering for Staines' strategic commercial market

Staines-upon-Thames occupies one of the South East's most strategically valuable commercial positions, where the M25 meets the Heathrow logistics corridor. The town's development market is driven by logistics operations, data centre investment, the BP campus redevelopment, and business park expansion across the Spelthorne borough. Rospower Projects delivers civil engineering, groundworks, and utility infrastructure for the developers and commercial operators capitalising on this market.

Our clients include Copart, Safestore, and Stratstone. We bring the capability and programme discipline that major facility construction demands to every Staines project.

## BP campus redevelopment

The former BP International Centre for Business and Technology is one of the largest development sites in north Surrey. The campus redevelopment is set to deliver a significant mixed-use scheme incorporating commercial, residential, and community uses on a substantial brownfield site. Projects of this scale require civil engineering contractors experienced in complex phased delivery, contaminated land management, large-format below-ground infrastructure, and multi-stakeholder coordination.

Rospower's track record on large-scale commercial projects across the UK, including multi-month programmes for major national clients, demonstrates the capacity these landmark developments require.

## Heathrow corridor logistics and distribution

Staines' position adjacent to [Heathrow Airport](https://www.heathrow.com/) and the M25 at Junction 13 makes it a natural hub for logistics, distribution, and aviation supply chain operations. The A30 London Road corridor and surrounding industrial areas host a concentration of operators who depend on fast airport and motorway access.

We bring specialist experience in logistics and automotive facility construction, honed through projects for clients like Copart. Our work includes heavy-duty pavement design, vehicle circulation infrastructure, loading dock construction, specialist drainage systems, and the NERS-accredited utility connections, delivered in partnership with [UK Power Connections Ltd.](https://www.lrqa.com/en-gb/utilities/ners/search/?q=UK+power+connections), that new or expanded facilities require. For logistics operators in the Staines corridor, our ability to deliver integrated groundworks and utility packages under a single contract reduces programme complexity and accelerates delivery.

## Data centres and digital infrastructure

The M25/Heathrow corridor is attracting significant data centre investment, with operators drawn by the area's power infrastructure, connectivity, and strategic position. Data centre construction demands precision civil engineering: specialist foundations, robust drainage, heavy-duty access roads, and utility infrastructure capable of supporting intensive power and cooling systems.

Our NERS accreditation and experience in large-scale industrial groundworks position us well for this growing sector in Staines and across the Spelthorne area.

## Commercial and retail development

Causeway Park, London Road business parks, and the Staines central business area support a diverse commercial occupier base generating ongoing construction and infrastructure requirements. Two Rivers retail and leisure park, one of north Surrey's largest commercial destinations, produces regular refurbishment and improvement works.

## Services we deliver in Staines

- **Industrial and commercial construction** covering foundations, drainage, structural slabs, and external works for office, warehouse, and data centre developments
- **Automotive and logistics facilities** with specialist experience in distribution centres, vehicle storage, and loading infrastructure
- **Utility connections** as an NERS-accredited contractor, installing gas, water, and multi-utility infrastructure
- **Self-storage and retail** groundworks for self-storage facilities and commercial developments
- **Residential and mixed-use** groundworks for housing schemes and brownfield regeneration projects

## Get in touch

Call us on **07983 740 555** or email **hello@rospower.co.uk** to discuss your Staines project. We work alongside [Spelthorne Borough Council](https://www.spelthorne.gov.uk/) and [Surrey County Council](https://www.surreycc.gov.uk/) on local infrastructure schemes. Rospower Projects holds Constructionline Silver accreditation and delivers NERS-accredited civil engineering with a proven national track record.
