# Logistics infrastructure across Hampshire

> Rospower Projects delivers civil engineering, groundworks, and utility infrastructure across Hampshire. NERS accredited, Constructionline Silver. Supporting logistics, aerospace, and commercial sectors. Call 07983 740 555.

- Canonical HTML: https://rospower.co.uk/areas/hampshire/
- Documentation index: https://rospower.co.uk/llms.txt
- Area type: county
- Updated: 2026-05-08

## Page content

## Civil engineering for Hampshire's growth sectors

Hampshire combines one of the South East's most active logistics markets, a nationally significant aerospace cluster, and two of the UK's largest ports. Rospower Projects brings the civil engineering capability, accreditations, and sector experience these projects demand.

### Logistics and distribution

The M3 corridor between Basingstoke and Winchester, alongside the A34 linking the Midlands to the South Coast, hosts one of the densest logistics occupier bases in the South of England. Rospower delivers civil engineering for distribution and warehouse facilities of all scales:

- **Heavy-duty yard construction** with reinforced concrete and engineered sub-bases for HGV and reach stacker traffic
- **Loading bay and dock leveller foundations** built to precise tolerances
- **Drainage systems** designed for large impermeable areas, including attenuation tanks and outfall connections
- **External works** including perimeter roads, staff car parks, and gatehouse foundations
- **Utility connections** under our NERS accreditation (held in partnership with [UK Power Connections Ltd.](https://www.lrqa.com/en-gb/utilities/ners/search/?q=UK+power+connections))

Our work for Copart, including a nine-month vehicle storage yard project, demonstrates the scale and sector expertise Hampshire's logistics market demands.

In East Hampshire, we recently delivered the [LV electricity network for the Meadow Vale residential development on Anstey Lane, Alton](https://rospower.co.uk/projects/lv-network-anstey-lane-alton/), in partnership with UK Power Connections. The package included 380 metres of waveform cable, 14 single phase residential connections, and full road reinstatement under live highway working with two way portable traffic signals.

### Aerospace and advanced manufacturing

Farnborough Business Park, the Farnborough International Exhibition and Conference Centre, and the wider Hampshire aerospace supply chain anchor a significant specialist engineering base. Advanced manufacturing and R&D facilities require civil engineering contractors comfortable with precision foundation systems, high-capacity utility connections, and secure perimeter construction.

### Ports and Solent Freeport

Southampton and Portsmouth are among the UK's largest container and logistics ports. The [Solent Freeport](https://solentfreeport.com/) designation is driving additional investment in advanced manufacturing, port-related logistics, and clean energy infrastructure. These programmes demand civil engineering contractors with scale capability and full utility accreditation, which Rospower provides.

### Warehousing and trade counter

Hampshire's established industrial estates, including those around Basingstoke, Eastleigh, Fareham, and Andover, host a mature base of light industrial, trade counter, and warehouse occupiers. Rospower delivers new-build and refurbishment civil engineering packages that sit at the heart of our industrial capability.

### Renewable energy

Solar farm and renewable energy infrastructure are increasingly active across rural Hampshire and along the Solent coast. Rospower delivers the access tracks, substation foundations, and cable trench civil engineering these schemes require.

### Ground conditions

Hampshire's geology varies from Chalk in the north, through London Clay and Reading Beds, to the Bracklesham Group and Barton Clay along the coast. Chalk solution features and occasional running sand conditions require careful geotechnical assessment. Our experience with variable ground conditions ensures appropriate foundation solutions from the outset.

### Discuss your Hampshire project

Call **07983 740 555** or email **hello@rospower.co.uk** to discuss your project. We work alongside [Hampshire County Council](https://www.hants.gov.uk/) and the county's district authorities to deliver national-calibre civil engineering to Hampshire's logistics, aerospace, and commercial sectors.
